
INVESTOR:
TML INC.
DATE OF WORK:
01.05.2025
PERIOD OF WORK:
01.05.2026
TRANSFORMER POWER:
3.0 MVA
(PREVIOUSLY NOTED AS 2750 KVA, REVISED TO 3.0 MVA)
GENERATOR POWER:
3.0 MVA
(PREVIOUSLY NOTED AS 2750 KVA, REVISED TO 3.0 MVA)
SCOPE OF THE PROJECT:
ELECTRICAL WORKS
STATUS:
(ONGOING) PROJECTS