OMAR AL MUKHTAR UNIVERSITY (2025)

INVESTOR:
TML INC.

DATE OF WORK:
01.05.2025

PERIOD OF WORK:
01.05.2026

TRANSFORMER POWER:
3.0 MVA
(PREVIOUSLY NOTED AS 2750 KVA, REVISED TO 3.0 MVA)

GENERATOR POWER:
3.0 MVA
(PREVIOUSLY NOTED AS 2750 KVA, REVISED TO 3.0 MVA)

SCOPE OF THE PROJECT:
ELECTRICAL WORKS

STATUS:
(ONGOING) PROJECTS

Scroll to Top