BENGHAZI INTERNATIONAL CONTAINER PORT 2025

BENGHAZI INTERNATIONAL CONTAINER PORT 2025
BENGHAZI INTERNATIONAL CONTAINER PORT 2025

PROJECT:
BENGHAZI CONTAINER TERMINAL PROJECT / LIBYA

INVESTOR:
STFA GROUP A.S.

DATE OF WORK:
24.02.2024

PERIOD OF WORK:
01.06.2026

TRANSFORMER POWER:
2 × 20 MVA

GENERATOR POWER:
18.25 MVA

SCOPE OF THE PROJECT:
CONTAINER PORT ELECTRICAL WORKS

STATUS:
(ONGOING) PROJECTS

Scroll to Top