MISURATA FREE ZONE INFRASTRUCTURE ELECTRICAL WORKS (2021)

MISURATA FREE ZONE INFRASTRUCTURE ELECTRICAL WORKS (2021)
MISURATA FREE ZONE INFRASTRUCTURE ELECTRICAL WORKS (2021)

INVESTOR

TML CC

DATE OF WORK                          

2021

PERIOD OF WORK                     

8 MONTHS

TRANSFORMER POWER          

21000 KVA

GENERATOR POWER

—

AREA OF CONSTRUCTION     

—

SCOPE OF THE PROJECT        

ELECRTROMECHANICAL WORKS

Scroll to Top